INDOT IB-33023 - Milton Madison Bridge
Installing approximately 2,250,000 pounds of rebar for the Milton Madison Bridge project. This project is a crossing of the Ohio River between the towns of Milton, KY and Madison, IN. The main (river) span is a 2,427 ft long steel truss bridge with a pedestrian walkway. Below is a you tube of the second span being floated and lifted into place on the project. Project Completion Date = Mid 2013
For more information regarding this project, please check out the Milton-Madison Bridge website.